
Case Studies
Testimonial
"A.C. have completed an excellent project in supplying and installing the technical facilities. They rose to the challenge of installing all equipment and extensive wiring work in just two weeks, and the theatre was ready to use after the third week."
David Coeshall, Project Manager
Venue: East Berkshire College
Project: Drama Studio Technical Facilities
Disciplines: Lighting supply and installation
Brief:
Supply and install stage lighting, sound & communications, and other staging equipment within two weeks.
Main Equipment Provided:
- IT network and main distribution system
- Selcon lighting fixtures
- Lighting grid
- Paradim dimming
- Compulite Dlite 36 / 72 lighting console
- Soundcraft Spirit Folio FX8 mixer
- Crown amplifiers
- Turbosound loudspeakers
- Shure microphones
- Sennheiser microphone stands and cables
- Hard of Hearing induction loop system
- Perimeter curtain track and drapes
- Genie Ariel Work Platform
- Stage management intercom system
- Projector facilities
- House light control facilities
- Audio & video tie lines
Other Services Provided
Refurbishing and hanging existing lighting fixtures. Full hands-on staff training.